Deqing Leixin Coating Equipment Co., Ltd.
Deqing Leixin Coating Equipment Co., Ltd.
Platinum Verified Supplier
1Yr
Verified Business License Business License
Main Products: powder coating line, Electrophoretic coating line, Spray painting line, Oven
Home > Blog > Lighting Metal Parts Factory Coating Pre-Treatment Wastewater Case

Contact Us

Mr. Lu
manager
Chat Now

Your inquiry content must be between 10 to 5000 characters

Please enter Your valid email address

Please enter a correct verification code.

Lighting Metal Parts Factory Coating Pre-Treatment Wastewater Case

Surface Engineering Association 2025 survey states improper wastewater management leads to 21% environmental penalties for metal finishing plants. A lighting metal parts manufacturer worked with Leixin to design wastewater layout.

Project Background & Challenges

• No collection tank for pre-treatment rinsing wastewater

• No neutralization tank for acidic and alkaline waste liquid

• Discharge flow may exceed local environmental limit

• H2: Leixin Customized Solution

• Design dedicated collection tank for pre-treatment wastewater

• Recommend neutralization system for acid and alkaline waste fluid

• Calculate wastewater volume based on hourly line output

Step-by-step Project Delivery

1. Calculate daily wastewater output generated from pre-treatment tanks

2. Build wastewater collection tank and neutralization system

3. Check local wastewater discharge standards before commissioning

 Measurable Project Result

The client avoided environmental penalty with compliant wastewater layout.

FAQ

 Does immersion pre-treatment produce wastewater?

A: Yes, immersion pre-treatment generates rinsing wastewater.

 Is wastewater treatment included in standard turnkey scope?

A: Wastewater treatment is optional extra scope instead of standard package.Discuss pre-treatment wastewater layout before finalizing coating line design.


Share

Contact Us

Send Inquiry to Us
* Message
0/5000

Want the best price? Post an RFQ now!

Recommended Products